How a 5 Ton per Day Fortune 500 Township Freed Up 10,000 sq. ft. of Land
Case Study: Large Townships in India

Before BillionCarbon
For a high-end residential and corporate township in Ahmedabad, managing five tons of food waste every day was becoming a serious operational challenge.
The township was already processing part of its food waste on-site using Organic Waste Composting (OWC) machines. But the process created another problem: large quantities of wet sludge had to be handled every day and then spread out for drying.
That meant dedicating a significant amount of valuable land simply to deal with the output sludge of the waste-treatment process.

It also meant manpower. Workers had to move, spread, turn and manage the sludge every day. And for a premium residential and corporate township, odour around the waste-management area was an equally important concern.
The objective was therefore much bigger than installing another waste-processing machine.
The township wanted to treat 100% of its food waste on-site, while reducing the land, labour and day-to-day hassle involved.
That’s when BillionCarbon came into the picture. With its 3-Day Precision Food Waste Treatment solution, BillionCarbon took responsibility for managing the process end-to-end powered by its Data Intelligence platform - treating the full 5 Ton Per Day Food Waste on premise.
What changed
10,000 sq ft of land was freed up
This was the biggest transformation at the site.
BillionCarbon's process produces no sludge. The recovered outputs are compact in volume and can be periodically conditioned and utilised within the township for horticulture.
As a result, the large area that had previously been required for spreading and drying wet sludge was no longer needed. Approximately 10,000 sq ft of land was released for productive use.
Manpower reduced from 8 people to 4
The earlier operation depended heavily on daily sludge handling. Moving, spreading, drying and managing the material required a sizeable workforce.
With BillionCarbon, daily operations became significantly lighter. The manpower requirement for the facility reduced from eight people to four, without compromising the site's food-waste processing capacity.
No odour — an important change for a premium township
This is a high-end residential and corporate township, so the experience around the waste-management facility matters.
Under the earlier setup, odour from the processing and sludge-handling area had led to complaints from residents. And in monsoons, the sludge drying area used to get flooded and had became a breeding ground for mosquitos.
With the new process, the facility became clean and odour-free — and the residential complaints stopped.
100% of food waste treated on-site
Instead of processing only a portion of the waste internally and managing the rest through other routes, the township could now treat all of its food waste within the premises.
A fully managed, zero-hassle operation
Perhaps the less visible but equally important change was responsibility.
BillionCarbon doesn't simply install the system and leave the facility team to operate it. The treatment process is managed by BillionCarbon, including technical supervision, process management and ongoing support.
For the township team, food waste treatment stopped being something they had to constantly manage.
The Outcome: Numbers tell the story!
5 tons of food waste treated every day.
10,000 sq ft of land freed.
Manpower cut from 8 to 4.
No sludge. No odour.
100% on-site treatment.
For the township, that was the real transformation.
A cleaner, compact and zero-hassle food waste treatment system - that can scale with the growing needs of the township.

Want to explore this for your organisation?
If you’re evaluating food waste treatment technology solutions for your organisation,
Reach out at info@billioncarbon.com and we will get back to you.




Comments